Projects

Golden Beach Gas Export Pipeline

Stockton Drilling Services were engaged by Grant Bowley Consulting on behalf of GB Energy Holdings to undertake a trenchless assessment of the Golden...

Tauranga Harbour Crossing – Lucas Engineering and Construction

Brain Perry Civil was awarded a Contract by Tauranga City Council to upgrade the local sewerage system.  This contract included the installation of...

East Coast Gas Study – Port Kembla LNG

Stockton Drilling Services were engaged by WorleyParsons to assist in the planning and route selection of a 400mm diameter steel gas pipeline that...

North Creek Canal Underbore Design – Ballina Shire Council

  Stockton Drilling Services have been engaged by Ballina Shire Council to undertake the design of North Creek Canal by Horizontal Directional Drilling...

Longford Liquids Pipeline – Specialist Engineering and QA Inspection

The Longford Liquids Pipeline under construction by Nacap Australia has utilised up to 6 HDD rigs at anyone time and has over 80 HDD crossings...

Anglesea Outfall Replacement – Design and Construct

  In August this year Barwon Water awarded the design and construction of an emergency outfall replacement to Dunstans Construction Group. Stockton Drilling...

SA Power Networks New Royal Adelaide Hospital

  Client: South Australian Directional Boring (SADB) for South Australian Power Networks (SAPN) Completion Date: June 2014 Project Scope of Work: Stockton Drilling...

QCLNG Project Narrows Crossings – HDD Engineering and QC Inspection

Client: QCLNG Services Provided: Engineering and Expert Advice / HDD QC Inspection / Gyro Survey Completion Date: September 2013 Project Scope of Work:  Queensland Curtis LNG is...

Longford Gas Conditioning Project – HDD Engineering and QC Inspection

Client: Esso Australia Resources Services Provided: Engineering and HDD QC Inspection Completion Date: September 2013 Project Scope of Work:  Stockton Drilling Services were engaged to assist...

MCJV The Narrows Gladstone – Gyro Survey

Client: MCJV Services Provided: Gryo Survey Completion Date: June 2013 Project Scope of Work:   Stockton’s were engaged by MCJV to conduct an end to end survey...

Longford Gas Plant Project – Gyro Survey

Client: Wood Group PSN Services Provided: Gyro Survey Completion Date: June 2013 Project Scope of Work:  Sixteen DN160 conduits were installed by HDD for high voltage...

Gorgon Gas HDD Shore Crossing – HDD Engineering, QC Inspection and Project Management

Client: Chevron Australia / JP Kenny and Technip Joint Venture Services Provided: Engineering services, Client HDD Advisors and Project Management support Completion Date:...

Latest News

03.02

Marinus Link

Stockton Drilling Services, Australia’s premier shore approach specialist and trenchless designer has...

20.03

Star of the South

Stockton Drilling will be collaborating with WSP on Australia’s first offshore Wind...

06.06

Utilising HDD in Urban Environments

How do HDD operations in urban environments differ from operations in open...

Contact Us

Charles Stockton
Managing Director/HDD Specialist

p
+61 (0) 400 623 441
e
charles@stocktondrillingservices.com
a
158B Gaudrons Road Sapphire Beach NSW, 2450, Australia

© 2013 Stockton Drilling Services. All Rights Reserved. Website by Giant Media. | Admin