(02) 5606 2720 / 0400 623 441

Experts in horizontal directional drilling

Home > News

News from July 2015

29.07

Map Your Pipeline or Risk Disaster

Trenchless Australia News Article (link) The Australian market has been slow to take up gyro surveying and pipe mapping technology, explains Charles Stockton,...

29.07

Arrow Bowen Pipeline FEED

Arrow Bowen Route MapĀ (link) Arrow Energy is progressing front-end engineering design (FEED) work for its proposed Bowen pipeline, which will take gas from...

Latest News

06.06

Utilising HDD in Urban Environments

How do HDD operations in urban environments differ from operations in open...

07.02

To Assist With Project Planning, What Geotechnical Information Should be Obtained When Designing a Complex HDD

The importance of defining the crossing geology should never be underestimated. This...

15.08

What are some of the key steps to take to ensure no damage is caused during an HDD installation?

There are several factors to consider. The five most important things to...

Contact Us

Charles Stockton
Managing Director/HDD Specialist

p
+61 (0) 400 623 441
e
charles@stocktondrillingservices.com
a
158B Gaudrons Road Sapphire Beach NSW, 2450, Australia

© 2013 Stockton Drilling Services. All Rights Reserved. Website by Giant Media. | Admin